Stock Condition Survey Case Sutdies
Undertaken within a short 6-week timeframe Oakleaf undertook a full block level survey of the complicated ‘Best-Buy' West Suffolk Hospital. 
 
Read More

Southampton Solent University contracted Oakleaf Surveying LTD to undertake a 10 year condition and statutory compliance review to assist with both the University's long term maintenance planning and their HESA return obligations.

{addthis off}

Read More

Oakleaf were commissioned to undertake a detailed 10 year condition and functional suitability survey of the entire of Cranfield University's academic estate.

{addthis off}

Read More

Millfield School is one of UK's premier independent schools located to the heart of rural Somerset. The Oakleaf Group were awarded a combined condition survey, including Mechanical and Electrical Services, and Fire Risk Assessment after a competitive tender process in October 2015.

{addthis off}

Read More

The Oakleaf Group were commissioned in September 2015 to undertake a condition survey and functional of Cambridge University's academic estate. The Estate comprised a hugely varied and historic range of building stock ranging from the renowned Fitzwilliam Museum through the modernist Sidgwick site to the contemporary structures present to the West Cambridge site.

Read More

The Oakleaf Group undertook a detailed rooms-based condition review of Uppingham Community College on behalf of the school's facilities team. Working in close conjunction with the premises manager and taking into account the limitations of the school's maintenance budget, Oakleaf were able to provide a detailed five year investment plan to fit with the school's ambitious standards.{addthis off}

Read More

The Oakleaf Group were contracted by the prestigious Dr Challoner's Grammar School, Buckinghamshire to completely review their school estate and report on all known and predictable maintenance works over a 10 year period. The project was turnaround within a two week timescale to meet with the School’s need for accurate data ahead of their drive for Academy status. {addthis off}

Read More

The Oakleaf Group carried out a complete review of the entire Buckinghamshire County Council’s Secondary School Building stock condition over a six-month period in Spring 2009.{addthis off}

Read More

The Oakleaf Group carried out a complete review of the entire of Northumberland County Council’s building stock over a five year period. The project involved a rooms based condition survey, with all data being uploaded into the Council’s Evo1ution database, and a Suitability/Sufficiency review.{addthis off}

Read More

The Oakleaf Group were contracted to survey a selection of Northamptonshire County Council buildings in the spring of 2011, these varied from small village libraries through to large 100,000sqft secondary schools. The project was delivered within a very tight two month time period to ensure the Council had adequate time to meet their internal auditing requirements. {addthis off}

Read More

The Oakleaf Group have provided a variety of specialist surveying to St Andrews Health Care over a five year period. St Andrews Health Care is based at St Andrews Hospital in central Northampton with several 'satellite sites' around the country. Working to the Estate Team's specification Oakleaf have surveyed the entire of the Northampton estate to provide accurate 5 Year maintenance plans to tie in with planned ward refurbishment.{addthis off}

Read More

The Oakleaf Group were contracted to survey the entire Craegmoor Health Care estate over a six month period between December 2009 and May 2010. Following the successful completion of the stock condition surveys Oakleaf were commission to carry out further pre-acquisition and measured surveys as part of Craegmoors’ drive for growth.{addthis off}

Read More

The Royal London Group were looking for a specialist firm to undertake a review of their statutory compliance and maintenance liabilities across their extensive estate, with particular focus on their Wilmslow and Edinburgh property portfolios, and approached Oakleaf to submit a fee bid proposal. Following consultation and interviews, Oakleaf were appointed in December 2010 to carry out the reviews.{addthis off}

Read More

The Oakleaf Group were contracted by Coca-Cola to advise on the maintenance and statutory liabilities at the historic Malvern Water plant in Herefordshire. Liaising directly with the onsite maintenance team, to ensure that the surveys were undertaken outside of manufacturing periods both out of hours and on shut down days, Oakleaf were able to maximise onsite productivity whilst minimising disruption to the plant. {addthis off}

Read More